Vacancy :
Sr Field Engineer dalam sbuah offshore pipelaying project.
• 6-12 yrs of work exp in offshore industry particularly in rigid pipeline installation, riser and tie-ins installation. If they have flexible line installation experience also, it would be a good additional value
• Manage (flexible) construction team throughout offshore planning and procedure preparatory phase
• Coordinate mobilization and set-up of all equipment and personnel onto construction barges. including saturation & air dive systems, ROV systems, flexible pipe lay equipment etc
• Manage offshore operations from Leighton office during installation of ten I-tubes onto existing producing platforms, pull-in and laying of NKT flexible, installation of concrete pipeline supports at crossing & free span correction locations plus pre-commissioning of all rigid and flexible lines.
• Delivery focused with proven experience in achieving project goals whilst maintain high standards in HSEQ at all times.
• Familiar with international codes particularly related with offshore installation and operations
• Involved in installation procedure preparation
• Involved in vessel mobilization and preparation
• Involved in offshore operations / vessel operations
• Person will be based offshore during the season.
The Iraq Crude Oil Export Expansion Project (ICOEEP) is perhaps the most important strategic project in the Iraqi Ministry of Oil’s (MoO) Master Plan. The Crude Export Facility of Southern Iraq currently exports approximately 1.8 MMBOPD from onshore facilities to the KAAOT and ABOT offshore terminals.
· The MoO Master Plan 2007 has the objective of developing further offshore loading facilities to enable export capability of 4.5 MMBOPD within 5 years. The ICOEEP Project is designed to achieve this objective.
· ICOEEP Phase 1 includes the following scope of works on a full engineering, procurement, construction and commissioning basis:
• Installation and commissioning of two 48” parallel pipelines, 20km onshore and 120km offshore.
• Installation of three SPM systems (single point mooring systems) capable of receiving and loading VLCC tankers.
• Fabrication and installation of a 600MT Subsea Valve Manifold.
• Dredging works to achieve pipeline trenching and sufficient water depth for VLCC mooring.
• Construction and commissioning (civil, mechanical and electrical works) for the new onshore facilities at Fao terminal.
• Installation of subsea Fibre Optic Cables and Composite Power Fibre Optic Cables.
• Installation and commissioning of Telecommunications and SCADA systems.
• Full commissioning, Client training and initial operation responsibilities to ensure the Client is equipped to operate and maintain the new exporting facilities.
(www.spencer-ogden.comrta).